Kinnerton Street, Belgravia
This was a stunning client commission working with Well St Studio. After shelling out the Grosvenor Estate property and its carcass removed, BRAC Contracts rebuilt it from behind the original façade.
Completed work included:
Moving the main stairs
Removing and replacing the conservatory
Lowering the ground level beneath to create a double- height volume.
The creation of a substantial living room space looking over the double height volume
Opened up the rear and south facing façade
To load bear the new glazed flat roof, concrete joists were installed over the new double height space
Removal of Chimney structure
Installation of a folding steel frame double doorset
Installation of a bespoke cast iron Juliette balcony
Using reclaimed and reused site brick, the upper rear façade was built back
Installation of a fully glazed rear extension
Much of the building was found to be in poor condition following investigative demolition. This required replacement. Having also found several obstructions and a disused coal tunnel extending under adjacent properties BRAC Contracts had to carefully piece together all remedial work.
If you’re looking for high-quality, budget-friendly, experienced and reliable contractors look no further than BRAC Contracts. With a range of services on offer, we’re guaranteed to offer what you’re looking for. So, what are you waiting for? Get in contact with us today by either calling us on 01268 573933, emailing us at enquiries@brac-contracts.co.uk or by filling in our online form.
“We had a tight programme for a technically challenging project and BRAC Contracts managed the project from start to finish meeting our deadlines and delivering an excellent end result. It was an enjoyable experience working with such professionals”.
Paul Holliday – Queensmead School
SPACE have contracted BRAC on a number of occasions, they are a pleasure to work with , highly professional, they care about the detail and offer a value for money service. The BRAC team have a positive, can-do attitude and find solutions to any challenge. We recommend them highly.
Anna Harding – Chief Executive SPACE
The quality of the works undertaken by BRAC for the new Woolwich Ferry Operations office has been most impressive, as has been the efforts by all the construction team to ensure an on schedule and on budget completion.
Mark Willbourn – Briggs Marine Contractors Ltd